Oahu Yurts


Catering | Culinary Shop | Menus | Living | Yurts

Oahu Custom Yurts Made in Hawaii

YurtsEvery order is custom built!

If you need design assistance, such as deck plans, best floor options, or suggested elevation, ― just ask.

Shop and order BACKYARD 12’2″ yurt model, 119.9 square feet at $4,999 OR MALAMA 16′ model, 201 square feet at $7,999 here.

Backyard Yurt

Backyard Yurt

Recommendations for architectural plans are available, ― with or without a permit goal.

YURT FAQs
More tips on the Yurt Living Blog.

WALL
How tall?
Our lowest standard wall height is 7-feet tall (other manufacturers start at 5-feet).

DOOR
One door included. You may consider constructing a deck, canopy, or roof outside the door.

WINDOWS
What’s included?
Two 9-foot long clear vinyl roll-up windows with sewn-in screen. The roll-up can be interior or exterior.
Can I have more than 2 windows?
Yes, you can even have a wall section roll up instead of the window, but there may be an upgrade fee.
Placement?
Buyer decides, but pay attention to typical wind and rain direction. Also note sunrise and sunset locations, which will vary per season.

Malama Yurt

Malama Yurt

DOME
Clear sunroof dome with screen to vent air.

LODGING SIZE
The Backyard model can fit a twin or double sized bed. Drawers below the bed are recommended. The larger yurts can accommodate king-sized bedding, pending on your layout design.

COLORS
Inquire for swatches to view. Select for (1) roof, (2) main wall, and (3) base wall.

CONSTRUCTION
Plumbing with a water catchment is most common in Hawaii and a PVC flex rain gutter can be attached under the roof seam onto the rafters.

COMFORT
With solar, wind, or electric power, a standard 36-inch ceiling fan may be mounted under the dome.

TERMS
50% of yurt cost order deposit; balance due plus shipping cost from Oahu upon manufacturer’s completion.

SHIPPING
Shipping rates do vary almost on a daily basis, but expect between $100 to $250 freight cost from Honolulu to Hilo or Kona.

TIME FRAME
30 days for standard production, from date of deposit to ship-ready completion.